Heidelberg KS Cylinder

This little darling was inched into position on the morning of 7th September 2010 with the help of Steve Perry Transport, Dave and Alan.

There was a tiny hiccough when the fork lift got stuck in a dip in the lane and the press slipped off the fork, not to mention the fact that there's a slight incline just through the doors which made pushing the 2.6 tonnes of throbbing printing power just a little harder than it would have been on a level surface!

A subsequent visit from Ray Canter has left it beautifully levelled and breathing gently.
Flattr this
Find us on Google Maps